YN Your Name DB-01 · Electrical Engineer

MAIN INCOMER · Dhaka, Bangladesh

Your Name

Electrical Engineer

I design power systems that stay on — from substation one-lines to the last terminal in the panel.

Available for new projects

V000.0
Hz00.00
PF0.00
MCCB · 3P In 630 A Icu 50 kA

Flip the main

CKT 01

About

LIVE · DO NOT TOUCH

I am an electrical engineer focused on power distribution, protection and industrial control. I like problems where safety, reliability and cost all pull in different directions — and finding the design that satisfies all three.

My work spans LV/MV switchgear design, protection coordination studies, PLC-based automation, and commissioning on site. I am just as comfortable in ETAP as I am with a multimeter in front of a live board.

0+ Years in the field
0+ Projects energized
0MVA Largest system designed
0 Lost-time incidents
CKT 02

Skills

Power Systems

C63 LV / MV Distribution 95%
C50 Protection Coordination 90%
C50 Load Flow & Short Circuit 88%
C50 Earthing & Lightning 85%

Control & Automation

C50 PLC (Siemens / AB) 85%
C40 SCADA & HMI 78%
C50 VFD & Motor Control 82%
C40 Instrumentation 70%

Software

C50 ETAP 90%
C50 AutoCAD Electrical 92%
C40 DIALux 80%
C40 MATLAB / Simulink 72%

Standards

C50 IEC 60364 / 61439 90%
C40 BNBC / NFPA 70 80%
C40 IEEE 1584 Arc Flash 75%
C50 Testing & Commissioning 88%
CKT 03

Projects

CKT 3.1 Rating2 × 1600 kVA Voltage11 kV RoleLead design

11/0.4 kV Substation for a Textile Plant

Complete design of an indoor substation: HT switchgear, transformers, LT main distribution and PFI plant. Delivered the single-line, protection settings and as-built drawings.

  • ETAP
  • Switchgear
  • Protection
CKT 3.2 Buses84 StandardIEC 60947 RoleStudy engineer

Selectivity Study for a 300-Bed Hospital

Time-current coordination for normal and emergency supply, including generator and ATS logic, so a downstream fault never blacks out an operating theatre.

  • Coordination
  • ATS
  • Critical power
CKT 3.3 Motors6 × 90 kW PLCS7-1500 RoleAutomation

PLC Retrofit of a Pumping Station

Replaced relay logic with a PLC and VFDs, added SCADA monitoring and soft-fill sequencing. Cut energy use by 22% and eliminated water-hammer trips.

  • PLC
  • VFD
  • SCADA
CKT 3.4 Capacity250 kWp Inverters5 × 50 kW RoleDesign & T&C

Rooftop Solar PV with Net Metering

Grid-tied PV design including string sizing, DC/AC protection, earthing and utility net-metering approval. Commissioned and handed over in 10 weeks.

  • Solar PV
  • Renewables
  • Commissioning
CKT 04

Experience

  1. 2022 — Present

    Senior Electrical Engineer

    Company Name Ltd.

    • Lead electrical design for industrial and commercial projects up to 12 MVA.
    • Own protection studies and relay settings from concept to commissioning.
    • Mentor two junior engineers and review all outgoing drawings.
  2. 2019 — 2022

    Electrical Engineer

    Previous Company

    • Designed LV distribution, lighting and earthing for 20+ buildings.
    • Supervised panel FAT and site installation.
  3. 2015 — 2019

    B.Sc. in Electrical & Electronic Engineering

    University Name

    • Thesis: Optimal capacitor placement in radial distribution networks.
CKT 05

Contact

Have a project that needs power? Send a work order and I'll get back to you within two working days.

Location
Dhaka, Bangladesh
WORK ORDER No. —